Finally began in the living room. A vapour barrier against the wall, they are subsequently isolated.
The roof was isolated & also the lowered ceiling be isolated. Still much work to do :o)
The living room is finished -11 December 2008
May 2008 Beautiful flowers but I do not know which. The plant actually appears on a onion. I started with the masonry of two elevated herb beds.They should be 1.60 length by 1.20 m. wide.
Bit late but still..... Winter photos from late March.
Friday, 14 March 2008
A new fence for the chickens. Total work time ~ 6 & 1/2hrs.