Tuesday, 29 December 2009

Renovation works for the dinning room (September to December)

Sam and I build a new ceiling in the living room.






And finally - re-tiling the floor.









Sunday, 15 June 2008

Renovation work for the living room.
Finally began in the living room.
A vapour barrier against the wall,
they are subsequently isolated.


The roof was isolated &
also the lowered ceiling be isolated.
Still much work to do :o)




The living room is finished -11 December 2008

May 2008

Beautiful flowers but I do not know which.
The plant actually appears on a onion.

I started with the masonry of two elevated
herb beds. They should be 1.60 length
by 1.20 m. wide.